Inmark Tower
10 May 2013
710-722 George Street, Sydney NSW 2000
Luxury Twin Tower,
High-Rise, Mixed-Use Development - 217 City Residential Apartments/ Commercial/Retail
Client
Inmark DWS
Project Manager
M Projects
Builder
Parkview Constructions
Architect
Beta Solutions
Mechanical Consultant
Shelmerdines
Equipment Suppliers
Temperzone, Leasam, Fans Direct, Mitsubishi Heavy Industries, ABB, Raypak, Evapco, Smoothflow, AHTT, Elicent, Expella
Contract Type
HVAC Design and Construct - Orion Mechanical Services
- Design and Construct Contract
- Central Condenser Water System - Open Circuit Cooling Towers
- Gas-Fired Boiler, Buffer Tank - Closed Circuit Heat Exchanger
- BMS Controlled Variable Flow CW System
- Reverse Cycle Water Cooled Temperzone PAC Units
- Individual Temperature Control - Leasam Controls (Zoned)
- Horizontal Discharge Toilet Exhaust Systems - PVC with Individual Fans
- Motorized 2-Way Valves with T&A Balancing Device at each Temperzone WCPAC unit
- Stair-Pressurisation and Lobby Relief Systems
- FFCP Interface to all Essential Systems
- Car Park Ventilation - VSD and CO Controls
- Low-Noise - High Acoustic Specification
- Provisional CW and Kitchen Exhaust for Future Retail
- High Quality and Well-Coordinated Installation
- Efficient Commissioning and Client Handover
